An informational meeting to collect community input about traffic control operations for upcoming road projects in Sparks is scheduled from 4:30 to 6 p.m. May 8 at the Sparks Library, 1125 12th St.The Regional Transportation Commission of Washoe County is in the process of finalizing a design phase to rehabilitate the following sections of roadways in Sparks:
- 15th Street from C Street to Prater Way
- Franklin Way from the Union Pacific railroad crossing to East Greg Street
- Hulda Court
- El Rancho Drive from G Street to Oddie Boulevard
Known as Sparks Consolidated 19-01, the project is expected to start this summer and take about 3 months to complete.
For more information, visit https://www.rtcwashoe.com/metropolitan-planning/ or call 775-348-0400.